What Is Your Quality Ratio?
 
Even the best coordinated drawing sets generate an average 5 review comments per sheet and the average set generates 10 comments per sheet.
 
Each comment is a potential RFI, and each RFI, a potential Change Order. Interfaces between design disciplines pose the greatest risk of omissions and inconsistencies. Yet, conducting quality reviews to find and correct these conditions are often omitted to save time, money, or both. The result can be exorbitant time during construction administration recording, tracking, and answering questions. Neglecting quality reviews can lead to costly Change Orders, construction delays, and disappointed owners.
 
Plan for quality! Ensure your documents are methodically checked before the contractor sees them. Build confidence in your documents and reduce your CA phase time. Conspectus can show you how.