What Is Your Quality Ratio?
Even the best coordinated drawing sets
generate an average 5 review comments per sheet and the average set
generates 10 comments per sheet.
Each comment is a potential RFI, and each RFI,
a potential Change Order. Interfaces between design disciplines pose the
greatest risk of omissions and inconsistencies. Yet, conducting quality
reviews to find and correct these conditions are often omitted to save time,
money, or both. The result can be exorbitant time during construction
administration recording, tracking, and answering questions. Neglecting
quality reviews can lead to costly Change Orders, construction delays, and
disappointed owners.
Plan for quality! Ensure your documents are
methodically checked before the contractor sees them. Build confidence in
your documents and reduce your CA phase time. Conspectus can show you how.






