1 min read
What A Week! | Design Build Has Changed, Why Haven't Specs?
Elias Saltz, Steve Gantner, David Stutzman
November 23, 2026 at 4:54 PM
Episode Summary
Design-build promises collaboration, efficiency, and shared responsibility. So why are we still documenting projects as if they were design-bid-build?
Picking up where last week's DBIA conversation left off, Dave, Steve, and Elias challenge the industry's traditional approach to construction documentation. Are layers of submittals, product data, and shop drawing reviews always necessary when the project team is making decisions together?
Drawing on decades of experience, the team explores how early involvement of owners, contractors, designers, specifiers, and estimators can lead to better decisions, clearer performance requirements, and less administrative burden.
The conversation comes down to a simple idea: Make decisions early, document them clearly, and trust the team to deliver.
Perhaps it's time for our documentation practices to catch up with the collaborative promise of design-build.
Learning Points
Industry Insight: Design-Build Needs a Different Approach
Traditional design-bid-build documentation practices may introduce unnecessary administrative requirements into a delivery method built on collaboration and shared decision-making.
Practice Takeaway: Document Decisions, Not Just Requirements
Establish performance criteria, agree on solutions as a team, and record decisions early. Clear documentation helps prevent repeated discussions and keeps projects moving.
Process Lesson: Rethink Submittal Requirements
When products and systems have already been selected collaboratively, extensive product data and routine shop drawing reviews may add little value. Focus reviews on what is necessary for the project.
Risk or Opportunity: Reduce Burden Without Sacrificing Quality
Eliminating redundant documentation can save time and effort, provided performance expectations are clear and the team remains accountable for delivering the agreed solution.
People & Culture: Trust Makes Collaboration Work
Bring owners, facility managers, contractors, designers, specifiers, and estimators into decisions early. Replace the traditional “us versus them” mentality with shared responsibility and collaborative problem-solving.
Design-build documentation should support the way the team works, not recreate the barriers the delivery method was intended to overcome.
