Stay in Your Lane!
Stay In your lane. Remain behind the curtain. Take the drawings, create the specs. Question when necessary. Provide input when asked.
Focused on owner’s requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on architect's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on design-builder's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on construction manager's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Tech Tips received a CSI National Communications Award September 23, 2011 at the national convention.
The code includes two very different requirements for exterior wall water-resistive barriers (WRB). When using cement plaster exterior finishes, ensure the WRB is equivalent to two layers of Grade D paper, and not Type I (No. 15) asphalt felt. There is a big difference between the two. Find out what it is.
Visit https://www.conspectusinc.com/tech-tips.htm and view or download B2010 Cement Plaster Water-Resistive Barrier 11.10.01 and all previous Tech Tips.
Share your comments, your opinions, about this month's Tech Tips, by posting a comment, here.
Stay In your lane. Remain behind the curtain. Take the drawings, create the specs. Question when necessary. Provide input when asked.
Optimizing the Building Product Specification Process Without Overhauling Your Proven Workflows. In the commercial construction industry, our...
Continuing our interview with AI(A) via ChatGPT, this second blog is about the relationship of specifications and risk management. It is no surprise...