Focused on owner’s requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on architect's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on design-builder's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on construction manager's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Previous Tech Tip was updated to the current industry standards with the help of metal framing manufacturers. The metal framing industry stopped using imprecise gage thicknesses and started using precise minimum base metal thicknesses. Yet, many A/Es continue to specify metal framing by gage. Why adopt the newer standard? How did Underwriters Laboratories (UL) and Gypsum Association (GA) fire resistant designs incorporate the change?
Visit http://www.conspectusinc.com and click Tech Tips to view or download B2010 Metal Framing Thickness 18.08.01 and all previous Tech Tips.
Share your comments, your opinions, about this month's Tech Tips, by posting a comment, here.