The architect asked that I review the "front end" documents written by the design-builder for a new construction project. The front end including bidding requirements, contract requirements, conditions of the contract, and Division 01. The project..
by David Stutzman | Oct 29, 2012 | bidding, Construction Administration, Contracting, Design-bid-build, Design-build, Division 00, Division 01, General Requirements, Professional Practice, Project delivery method, Specifications
The architect asked that I review the "front end" documents written by the design-builder for a new construction project. The front end including bidding requirements, contract requirements, conditions of the contract, and Division 01. The project..