The architect asked that I review the "front end" documents written by the design-builder for a new construction project. The front end including bidding requirements, contract requirements, conditions of the contract, and Division 01. The project..
Design-Build Division 00 and Division 01
by David Stutzman | Oct 29, 2012 | bidding, Construction Administration, Contracting, Design-bid-build, Design-build, Division 00, Division 01, General Requirements, Professional Practice, Project delivery method, Specifications
How Can Owners Protect Their Interests?
by David Stutzman | Sep 17, 2012 | AIA, Construction, Contractor, Design-build, IPD, OPR, Owner, Professional Practice, Project Delivery, Architect, Specifications, Specifier, VE
Building owners contract with architects, contractors, design-builders, or integrated project delivery (IPD) teams to create the owners' facilities. These players are responsible for design and construction. There is an underutilized member of the design..