Specifying Design-Assist - How?

It's a process, not just technical requirements. During design-assist, the architect of record, asks the contractor (usually a specialty subcontractor) to help develop system details and confirm system performance to meet project requirements. Typically..

Do Relationships Matter?

August 4, Bloomberg News published an article about a way that the six largest US automakers could improve profits by $1.4 billion last year. No matter how the money would be split among them that should be enough to make the auto execs and the..

It's Just a Spec

Yes it is a spec, and it deserves attention - the proper attention to be certain the contractor delivers what is required by the contract. The design team created the drawings and specifications defining the project to meet the owner's requirements and..

Specifications Risk Management

There are many risks in construction projects, and specifications alone cannot mitigate construction risk in all areas. Good specifications, however, provide valuable benefits to architect/engineer (A/E) design team, owners, and other construction..

Ensuring Construction Quality | Mockups | Reference Standards

How can an owner be sure construction produces the quality the owner desires? There is likely no way to be absolutely certain. But specifiers rely on several techniques to help ensure work results meets the owner's project requirements.

Owners - What did you buy?

Friday, an architect asked for help researching a question about metal stud installation for interior partitions. The question was the result of a site visit. The resolution needed to be speedy. Monday the contractor planned to install gypsum board,..

Contract Documents are Related

It's a debate. The debate is evidenced in all the commercial guide specifications and even CSI's SectionFormat™. Related Requirements is an article heading near the beginning of specification sections. This article gives specifiers an opportunity to list..

Construction Documents - a Development Dichotomy

Architects and engineers are required to produce drawings and specifications as construction documents. The documents are developed throughout the design process - Schematic Design, Design Development, and Construction Documents. But the process for..

Collaboration for a Better Tomorrow

Design and construction projects require an enormous number of participants to complete each facility.  The basic teams include owners, architects, contractors, and suppliers. The lines of communication are well defined, especially after the construction..

Estimates of the Cost of Work

When is the architect required to prepare an estimate of the Cost of Work according to AIA Document B101 Standard Form of Agreement Between Owner and Architect?