Blog

Sign Up Today

Interested in keeping up with our communications? Sign up by clicking below.

Sign Up

1 min read

Lavatory Exposed Pipe Insulation

Accessibility standard ANSI A117.1 requires exposed water supply and drain pipes to be insulated or configured to prevent contact. Here is a lavatory installation photographed in a Philadelphia, PA restaurant. The only insulation is installed on the...

Read More

Large Format Tile Revisited

The publication of 2011 versions of the TCNA Handbook and ANSI A108, A118, and A136 addressed the challenges in large format tile installations. This...

Read More

Consider the Consequences

It must have seemed a good idea at the time - inexpensive, easy to install. Add a barrier to keep objects from falling from one parking level to...

Read More

3 min read

Specs Must State the Architect's Intent

"Why is it that Architects specify 'Intent' and can not specify what products they require? I have a real problem trying to price an Architect's...

Read More

1 min read

Construction Improvisation; Acceptable Quality?

Construction sites often present challenges for completing the work as the architect intended. But when contractors improvise, the results may not be...

Read More

1 min read

Succeeding with Substitution Requests, Contractors

This month's Tech Tip, geared toward product reps, is a good start to ANYONE interested in proposing substitutions. Randy makes a few excellent...

Read More

Succeeding with Substitution Requests, Product Reps

For product sales representatives, the key to getting products included in specifications during the Procurement (Bidding) Phase is understanding the...

Read More

3 min read

Coordinating Drawing Notes and Specs

The need to coordinate drawings and specifications may seem obvious, but why is it so important? There are two primary reasons:

Read More

1 min read

Safety Glazing Identification

Safety glazing must be identified according to International Building Code (IBC), 2009, Section 2406.3. This applies to all glazing, not just...

Read More

2 min read

Acceptable Product Submittals

A surprising dichotomy: Architects say approval of products that are not specified should be documented as contract modifications, but most simply...

Read More

Blog Sign Up